Difference between revisions of "Team:Kyoto/Engineering"

Line 1,312: Line 1,312:
 
                       src="https://static.igem.org/mediawiki/2021/3/32/T--Kyoto--modeling_Modeling_02_03_04_2p_ara%3D0.200_prod.png">
 
                       src="https://static.igem.org/mediawiki/2021/3/32/T--Kyoto--modeling_Modeling_02_03_04_2p_ara%3D0.200_prod.png">
 
                   </div>
 
                   </div>
                   Please refer to the following links for variation by degradation rate and promoter strength.
+
                   Please refer to the <a href="https://2021.igem.org/Team:Kyoto/Model">Modeling page</a> for variation by degradation rate and promoter strength.
 
                 </div>
 
                 </div>
 
                 <div id="sctargetD-3-4" class="myh2">Learn</div>
 
                 <div id="sctargetD-3-4" class="myh2">Learn</div>

Revision as of 09:12, 19 November 2021

Engineering Success
The following is a record of our Engineering Flow.
We have set a major goal to make the plant production more sustainable.
To achieve this goal, we established the four measures.
For each topic, we proceeded with the project in accordance with the Principles of Engineering.
Click each title to see detail
1. Virus and Viroid detection
2. Feeding RNAi for western flower thrips
3. Other applications for cut flower maintenance
4. Biomolecular Production Platform